UG600T - is designed for trenchless laying of pipilines under highways, railway embankments, in urban areas. It provides high speed and efficiency of work performing. Provides high speed and efficiency of performance - the puncture site soilup to 50 meters per shift (with standard setting).
The hydraulic unit is a frame within which the cylinders are working and auxiliary cylinder, which by the arms changes the position of the working cylinders. Levers are a unique system that changes the position of the cylinder, depending on the diameter of the pipe. This equipment allows to carry out the work in accordance with the requirements of SNIP-3.05.05-84 "Process equipment and process piping."